|
|
|
|
King River Copper continues to generate high-grade-Copper exhibition -non-ferrous metals expo 10/17/2018 Copper exhibition -non-ferrous metals expo |
--------------------------------------------------------------------------------------------------------------- |
|
Ongoing metallurgical test work at King River Copper’s Speewah vanadium-titanium-iron project has generated high-grade vanadium pentoxide above 98%, with the company continuing to refine its processes to identify the optimum and most commercially viable production method. Today’s news comes ahead of the vanadium scoping study which is due to be released this month. King River Copper is targeting production of a 99.5% pure vanadium pentoxide powder and a standard 98% vanadium pentoxide flake product. The company is also evaluating creating high-grade 99% titanium dioxide materials including pigment, as well as iron oxide hematite and vanadium electrolyte for use in the emerging vanadium redox flow battery sector.
King River Copper’s board stated “The evaluation of the best processing path to be taking to develop and/or market the Speewah deposits relies on the detailed process routes and studies currently being undertaken. Development planning may include the option to export portions of concentrate production''''
有色金属展-铜材展-2019年广州国际有色金属工业(铜业)展览会
-2019 China(Guangzhou)Int’l Non-Ferrous Metal(Copper)Exhibition
-Non-Ferrous Metal exhibition, 2019 Non-Ferrous Metal exhibition, Non-Ferrous Metal expo, 2019 Non-Ferrous Metal expo, Copper exhibition, Copper expo, 2019 Copper exhibition, 2019 Copper expo, China Copper exhibition, China Copper expo
.” |
|
|
|
|