Home AboutUs Exhibition
Info
News
Center
Exhibitor
Manual
Cost of
Participation
Floor
Plan
Exhibition
Retrospect
Media
Support
Contact Chinese
 News Type
Exhibition News
Industry News
Company News
Media reports
 New Detail
     
Tata Steel blast furnace in Port Talbot gets a big lift—The 20th China(Guangzhou)Int’l Heat Treatment, Industrial Furnace Exhibition
10/22/2018  热处理展-工业炉展-heat treatment expo-furnace expo
---------------------------------------------------------------------------------------------------------------
    TATA Steel announced that a significant and visible milestone was met on the project to extend the life of Tata Steel’s Blast Furnace 5 in Port Talbot last week as the new downcomer was lifted and fixed into place. Vital work is being carried out on the giant furnace – which has been running for the past 15 years producing almost 30 million tonnes of iron – to extend its life by five to seven years. In a remarkable feat of engineering, the pipe weighing in at more than100t and measuring 180ft long was lifted into position by a 1000t crane. Incredibly, to fit the gap that had been left by the removal of the old downcomer, the new pipe had to be made and fitted within a tolerance of just 3mm.

The woman leading the project Ms Rouha Hussaina said that “A great deal of planning and preparation was undertaken by our partners Mii, Primetals, Mammoet and our engineers and I am glad to see it executed as planned. To the passers-by it would appear to be a simple lift; however, a considerable amount of engineering was applied to accomplish the job in a safe and sound manner. Current technology including laser scanning and 3D-modelling and analysis was used to aid the lifting study. The downcomer was built in a remote location and transported using self-propelled modular transporters.”

The project, costing tens of millions of pounds and expected to take several months, will also see the waste gas and dust extraction system being replaced.

The Blast Furnace 5 life extension project is a critical part of Tata Steel’s long-term strategy to strengthen its operations in the UK and will underpin improvements throughout its UK supply chain. Confirmation of the investment came at the same time as the announcement in June of definitive agreements being signed by thyssenkrupp and Tata Steel to form a joint venture of their European steel businesses. 热处理展-工业炉展-2019第二十届广州国际热处理、工业炉展览会-中国效果最好的热处理工业炉展--巨浪展览 —The 20th China(Guangzhou)Int’l Heat Treatment, Industrial Furnace Exhibition -Heat Treatment exhibition, Heat Treatment expo, 2019 Heat Treatment exhibition, 2019 Heat Treatment expo, China Heat Treatment exhibition, China Heat Treatment expo, Industrial Furnace exhibition, Industrial Furnace expo, 2019 Industrial Furnace exhibition, 2019 Industrial Furnace expo, China Industrial Furnace exhibition, China Industrial Furnace expo
Copyright © 1996-2024  JULANG.COM.CN Stone Rich Sight. All Rights Reserved
Add:Room 3A05-3A06,Building A1,Xinghui Park,Huaming Road 29,Pearl River New City,Guangzhou,510623,China