|
|
|
|
Fume treatment plant upgrading at óAM ózdi Acélm?vek by Danileli—The 19th China(Guangzhou)Int’l Heat Treatment, Industrial Furnace Exhibition 5/9/2018 热处理展-工业炉展-heat treatment expo-furnace expo |
--------------------------------------------------------------------------------------------------------------- |
|
óAM ózdi Acélm?vek (Max Aicher Group) has selected Danieli Environment for the revamping of the existing Fume Treatment Plant in OZD, Hungary. The new FTP shall be designed to collect all the fumes and dust emissions of the primary and secondary suctions lines of the existing 67 ton electrical and ladle furnaces.
The project consists of the design, manufacturing and supply of a new Bag Filter equipped with 2 ID Fans with inverter, a new Axial Cyclone, a new common Dust Collecting System as well as the Electrical and Automation System. Canopy hood and secondary ducts will also be upgraded.
The FTP will treat 1,40 Mm3/h of secondary fumes, ensuring a dust content emission at the stack of less than 5 mg/Nm3, matching with the local regulation
The project will be implemented in 12 months.
热处理展-工业炉展-2018第十九届广州国际热处理、工业炉展览会-中国效果最好的热处理工业炉展--巨浪展览
—The
19th China(Guangzhou)Int’l Heat Treatment, Industrial Furnace Exhibition
-Heat Treatment exhibition, Heat Treatment
expo, 2018 Heat Treatment exhibition, 2018 Heat Treatment expo, China Heat
Treatment exhibition, China Heat Treatment expo, Industrial Furnace exhibition,
Industrial Furnace expo, 2018 Industrial Furnace exhibition, 2018 Industrial
Furnace expo, China Industrial Furnace exhibition, China Industrial Furnace
expo
|
|
|
|
|